1.
Gonçalves ALMG, de Miranda CAS, Pires FT, Tavares PHCP. STRUCTURING A PREVENTIVE MAINTENANCE PLAN WITH A FOCUS ON OPERATIONAL RELIABILITY: A CASE STUDY IN THE METALLURGICAL SECTOR. Editora [Internet]. 2026 Feb. 9 [cited 2026 Feb. 27];:254-80. Available from: https://sevenpubl.com.br/editora/article/view/9307